South Holston Lake was named for the river that bares the name of Steven Holston,
an early settler of the Tennessee Valley.

The construction of South Holston Dam was started on February 16, 1942 and was
completed November 20, 1950. The total cost of construction of the reservoir was
$31,242,224 taking more than 7,842,134 man hours to complete. The dam itself
contains 97,500 cubic yards of concrete. South Holston Dam and Reservoir was
constructed for the purpose of electric power, flood control, navigation, recreation, an
adequate supply of water and other related benefits.

The Dam is 285 feet tall and 1,600 feet long. The reservoir is 10,053 acres with a
shoreline of 160 miles and 8 miles of island shoreline.

There was 49 injuries incurred during the construction of the dam and reservoir with 3
fatalities. There was 342 families relocated and 559 graves had to be relocated.

South Holston Lake is on the South Fork Holston River and is surrounded by Sullivan
County in Tennessee and Washington County in Virginia.
Lake information provided by:
Copyright ©2006-2008 / KnoxWake.com / All Rights Reserved
Listen to latest Podcast on
local events and other
comments by
KnoxWake.com


Local Boat Dealers
Manufacturers
Local Tower
Manufacturers
Local Shop Sponsors
Music While You Surf

Love 89.1
Christian

90.3 The Rock
Alternative

93 Point 1
80s 90s & Now

94.3 TheX
Alternative

95.7 Jack FM
Alternative

B 97.5
Adult Contemp

Star 102.1
Top-40

103.5 WIMZ
Classic Rock

Hot 104.5
Hip Hop

107.7 WIVK
Country
"THE OFFICIAL BOAT OF THE KNOXWAKE WAKEBOARD COMMUNITY"
Schedule Your Test Drive Today
(To Drive One Is To Want One)
Parrott
Marine Systems, Inc.